Completed LeviArs kitchen with dark flat-panel cabinetry, waterfall island, stone backsplash and light wood flooring

Kitchen remodeling · Kirkland, Washington

Kitchen Remodeling in Kirkland & Greater Seattle

The room where everything comes together.

Create a kitchen that works better for cooking, gathering and everyday living. LeviArs coordinates kitchen design, custom and semi-custom cabinetry, countertops, backsplashes, flooring, lighting, plumbing, electrical work and construction.

Service at a glance

Kitchen remodeling by LeviArs

LeviArs helps homeowners across King and Snohomish Counties plan their kitchen remodeling project. Design, selections and construction are coordinated through our Kirkland Design Center.

Primary scope
Layout and storage planning, Custom and semi-custom cabinetry, Countertops and backsplash
Service area
King County and Snohomish County, Washington
Project delivery
One coordinated design-and-build process
First step
Consultation, site review and project priorities

Complete kitchen remodeling

Plan the room as one connected project.

A successful kitchen brings workflow, storage, materials, lighting and construction into one buildable plan.

Visit our Kirkland Design Center to compare materials and discuss your layout, storage needs, priorities and project budget. We serve homeowners in Kirkland, Bellevue, Seattle, Redmond, Sammamish, Snohomish and surrounding King and Snohomish County communities.

Your remodel is defined around your home and your goals. The written proposal identifies the work, materials, selections and coordination included in your project.

Kitchen cabinet options

Choose the cabinet path that fits your kitchen.

LeviArs offers both stocked cabinet collections and custom cabinetry. Compare the selection process, design flexibility, scheduling considerations and available samples before deciding which option fits your layout and priorities.

From planning to installation

What a complete kitchen remodel can include.

Each area is coordinated with the approved scope so design decisions, product requirements and construction sequencing support the same finished room.

01

Kitchen Design & Layout Planning

Review cooking routines, storage, circulation, appliance locations, island proportions and connections to adjoining rooms. Drawings or 3D renderings are included only when identified in the written design scope.

Explore Interior Design
02

Stocked & Custom Cabinets

Compare stocked cabinet collections with fully custom cabinetry, then coordinate the selected door styles, finishes, storage, organizers and appliance panels around the approved kitchen plan.

Compare Cabinet Options
03

Countertops & Backsplashes

Compare surface character, maintenance and edge details, then coordinate field measurements, fabrication, sink fit, backsplash decisions and installation timing.

Visit the Design Center
04

Lighting, Plumbing & Ventilation

Coordinate fixture choices, appliance requirements, electrical work, plumbing changes and ventilation with the layout and the applicable construction scope.

05

Flooring & Interior Finishes

Resolve flooring, transitions, surface preparation, drywall repairs, painting and trim where included so the kitchen connects cleanly with adjacent spaces.

Explore Flooring
06

Construction & Project Management

Sequence demolition, protection, debris removal, trade coordination, inspections, installation and the final walkthrough according to the approved written scope.

Planning your kitchen remodeling budget

Understand the scope behind the price.

Your proposal identifies the agreed work, selected materials, allowances and exclusions.

We explain separately scoped design services and review changes before additional work proceeds. Published price ranges are useful only when they reflect a comparable, documented scope, so LeviArs develops pricing for the actual home and plan.

01

Same-layout replacement

Keep the primary arrangement while replacing defined cabinetry, surfaces, fixtures or finishes. Existing conditions and code requirements still need review.

02

Layout-changing remodel

Rework islands, appliances, cabinetry, plumbing, electrical or circulation to improve how the room functions.

03

Extensively customized project

Coordinate tailored cabinetry, architectural changes, premium fabrication, connected rooms or more complex structural and mechanical work.

Look for these details in your proposal

  • Included construction work
  • Materials and allowances
  • Appliances and customer-supplied items
  • Design and permit responsibilities
  • Exclusions and concealed conditions
  • Change approval process

Project timing

Your Kitchen Remodeling Timeline

Many LeviArs kitchen remodels are planned for approximately 7–21 days of on-site work, after roughly 2–6 weeks for design, cabinet ordering and material selections. Larger or more complex projects can require more time. Before construction begins, we confirm the project sequence, anticipated kitchen downtime, material readiness and access requirements for your approved scope.

  1. 01

    Design & selections

    Define the layout, cabinetry, surfaces, fixtures, lighting and finish direction included in the scope.

  2. 02

    Ordering & approvals

    Confirm product information, material readiness, applicable permits or engineering and the construction sequence.

  3. 03

    On-site construction

    Coordinate protection, demolition, rough work, inspections and installation while communicating access and utility needs.

  4. 04

    Completion & walkthrough

    Finish the listed scope, review the completed work and identify any closeout items or applicable product information.

Materials and details from a completed kitchen

Built for daily use, down to the cabinet box.

LeviArs coordinates cabinetry, countertops, backsplash, appliances, ventilation and lighting as one kitchen system—not as disconnected purchases.

Compare quartz for everyday durability, natural stone for individual character, or porcelain slab for a clean full-height surface. Backsplash options can include hand-set ceramic or porcelain tile as well as coordinated slab applications.

The completed project below brings custom black oak cabinetry together with a Wolf cooking suite, Sub-Zero refrigeration and wine storage, bookmatched marble, integrated lighting and light wood flooring.

Completed LeviArs kitchen with black oak cabinetry, waterfall island, stone backsplash and integrated linear lighting
Complete kitchen · cabinetry, island, surfaces and lighting
Black oak appliance wall with Sub-Zero refrigeration, wine storage and Wolf wall oven in a LeviArs kitchen
Appliance wall · Sub-Zero storage + Wolf wall oven
Wolf six-burner range beneath a custom black hood with bookmatched stone backsplash
Cooking wall · Wolf range + custom hood

While we work in your home

What to Expect While We Remodel Your Kitchen

A complete kitchen remodel creates noise, dust, deliveries and temporary loss of the room. The goal is not to promise a disruption-free project; it is to explain the practical measures and communication built into your scope.

01

Before demolition

Remove food, dishes and personal items; identify access and parking needs; protect valuables; and plan a temporary kitchen, pets and children around the work area.

02

Protection & dust control

Crews use doorway sheeting and floor protection, cover adjacent surfaces and, when the work warrants it, seal return vents and use negative-pressure containment or HEPA filtration during dust-generating phases.

03

Deliveries & utilities

Material deliveries, appliance requirements and anticipated water, power or ventilation interruptions are coordinated with the active project schedule.

04

Communication & closeout

Your LeviArs Project Manager coordinates milestones, materials and questions. In-house teams handle cabinet, tile and flooring installation when included, followed by cleanup, a final walkthrough and documented closeout items.

Kirkland kitchen · completed LeviArs project

Before & After: A Complete Kitchen Transformation

This kitchen-focused view emphasizes the remodeling scope: a reworked island and cabinetry plan, integrated storage, coordinated surfaces, lighting and a finished connection to the surrounding home.

Project
Kirkland kitchen remodel
Location
Kirkland, Washington
Layout
Reworked island, cabinet and appliance arrangement
LeviArs role
Kitchen design and coordinated remodeling

Explore the Kirkland project and local remodeling guide →

What the homeowner wanted

Replace the dated cabinetry and undersized island with stronger storage, more useful work surfaces and a kitchen that felt connected to the rest of the home.

What LeviArs changed

Reorganized the cabinetry and appliance wall, enlarged and simplified the island, and coordinated dark flat-panel storage with dramatic stone surfaces and light wood flooring.

Why the decisions mattered

Full-height storage uses the perimeter efficiently, the island supports preparation and seating, and the contrasting palette keeps the large room visually composed.

Completed scope

Custom black oak cabinetry, island, Wolf and Sub-Zero appliances, bookmatched marble, plumbing fixtures, linear lighting, flooring and adjacent finish coordination.

Existing kitchen before the LeviArs remodel with wood cabinets and an angled island
Before · existing cabinetry and island
Completed LeviArs kitchen with custom black oak cabinetry, large marble island and integrated appliances
After · layout, cabinetry, island and surfaces
Light wood flooring connecting the completed kitchen with the remodeled stairs and hallway
Connected home · flooring and adjoining spaces
13+years of remodeling experience
Design + Buildone coordinated team
Licensedinsured and bonded in Washington
2 countiesKing and Snohomish service area

Frequently asked questions

Useful answers before you begin.

How much does a kitchen remodel cost?+

Kitchen remodeling cost depends on the room, cabinet package, surfaces, appliances, lighting, plumbing and electrical work, finish level and whether the layout changes. LeviArs develops project-specific pricing after reviewing the home, priorities, selections and construction scope. We do not use a small cosmetic update as a misleading starting price for a complete remodel.

What does a LeviArs kitchen remodeling proposal include?+

The proposal identifies the agreed work, selected materials or allowances, customer-supplied items and exclusions. It also explains whether design services, permits, engineering, tax or concealed-condition work are included, separate or dependent on the final scope. Review the written proposal for the terms that apply to your project.

How long does a kitchen remodel take?+

The complete timeline includes design and selections, ordering, any required approvals, on-site construction and completion or inspections. Before construction begins, LeviArs reviews the anticipated kitchen downtime, material readiness, access requirements and project sequence. A project-specific schedule is developed around the approved scope rather than one standard promise for every kitchen.

Can I use my kitchen during the remodel?+

A full kitchen is usually unavailable during active construction. Before demolition, discuss the anticipated downtime and planned utility interruptions with the project team. Many homeowners prepare a temporary area elsewhere with a refrigerator, microwave, coffee maker and basic supplies.

Should I change my kitchen layout?+

Not always. Keeping a functional layout may control cost and reduce plumbing or electrical changes. Reworking it can improve circulation, storage, work zones, island use, appliance placement or connections to adjoining rooms. LeviArs compares those priorities before recommending a direction.

Can I remove a wall to open my kitchen?+

Wall removal begins with an assessment of structural conditions and any plumbing, electrical or ventilation within the wall. Permit and engineering requirements are confirmed for the project location before the work is included in the construction plan.

Who handles permits and inspections?+

Permit and inspection responsibilities depend on the jurisdiction and project scope. The written proposal identifies the applicable responsibilities before construction. Required inspections are then coordinated with the approved project sequence.

Can I supply my own appliances or fixtures?+

Tell LeviArs early if you plan to supply an item. Exact model information, dimensions, utility requirements, delivery timing, inspection condition and installation responsibility must be coordinated before ordering. The proposal confirms which customer-supplied items are accepted and how they affect price and schedule.

What countertop materials can I compare?+

The appropriate surface depends on appearance, maintenance, durability, fabrication requirements and budget. Visit the Kirkland Design Center to compare the samples currently available through LeviArs and coordinate the selected surface with cabinetry, backsplash and flooring. Availability is confirmed for the specific project.

How are changes approved after work begins?+

A requested change or concealed condition should be documented before additional work proceeds. LeviArs reviews the effect on scope, price and schedule so the change can be approved in writing according to the project agreement.

Begin with your kitchen priorities

What should your kitchen do better?

Tell us where the home is located and what you want to change. Existing-kitchen photographs, timing and budget information are helpful but optional for the first conversation.

Request an appointment

Tell us what you want to explore.

Choose your project type and preferred appointment date, then tell us how to reach you. Project details, budget and photographs are optional. Our team will contact you to confirm availability.

Call (425) 248-7799 →
Open form in a new tab ↗

Your request is sent securely through this form. Preferred dates and times are not confirmed until a LeviArs team member contacts you. Read our Privacy Policy.